{"id":19,"date":"2017-11-14T11:38:16","date_gmt":"2017-11-14T11:38:16","guid":{"rendered":"http:\/\/ambercourt3.rmcweb.site\/?page_id=19"},"modified":"2021-06-14T14:43:19","modified_gmt":"2021-06-14T14:43:19","slug":"electrical","status":"publish","type":"page","link":"https:\/\/ambercourt3.bml.site\/index.php\/health-safety\/electrical\/","title":{"rendered":"Electrical"},"content":{"rendered":"<div id=\"pl-19\"  class=\"panel-layout\" ><div id=\"pg-19-0\"  class=\"panel-grid panel-has-style\" ><div style=\"padding: 100px 0; \" data-overlay=\"true\" class=\"panel-row-style panel-row-style-for-19-0\" ><div id=\"pgc-19-0-0\"  class=\"panel-grid-cell\" ><div id=\"panel-19-0-0-0\" class=\"so-panel widget widget_sow-editor panel-first-child panel-last-child\" data-index=\"0\" ><div style=\"text-align: left;\" data-title-color=\"#443f3f\" data-headings-color=\"#443f3f\" class=\"panel-widget-style panel-widget-style-for-19-0-0-0\" ><div\n\t\t\t\n\t\t\tclass=\"so-widget-sow-editor so-widget-sow-editor-base\"\n\t\t\t\n\t\t><h3 class=\"widget-title\">Electrical<\/h3>\n<div class=\"siteorigin-widget-tinymce textwidget\">\n\t<h3>EICR (Electrical Installation Condition Report)<\/h3>\n<p>This is a report of the condition of the electrical installation and will highlight any safety shortcomings, defects or deviations from the current revision of the electrical regulations BS7671.<\/p>\n<p>An electrical installation condition report should be performed by a competent electrician with the necessary experience and knowledge of the type of installation tested.<\/p>\n<p>It is a statutory requirement that properties where the public have access; are regularly checked and that an EICR is undertaken on the electrical services. The period between inspections is determined by the function and the use of the building.<\/p>\n<h3>EICR codes<\/h3>\n<p>The codes used to determine whether there are non-compliances or issue with the electrical installation and are numbered C1 to C3. These codes are shown on the Electrical Installation Condition Report, along with a description of the nature of any fault, and determine whether a \u2018Satisfactory\u2019 or \u2018Unsatisfactory\u2019 report will be applied to the installation.<\/p>\n<ul>\n<li><strong>Code C1<\/strong>\u00a0\u2018Danger present\u2019: There is a risk of injury and that immediate remedial action is required to remove the dangerous condition.<\/li>\n<\/ul>\n<ul>\n<li><strong>Code C2\u00a0<\/strong>\u2018Potentially dangerous condition\u2019: Urgent remedial action required, this should declare the nature of the problem, not the remedial actions required.<\/li>\n<\/ul>\n<ul>\n<li><strong>Code C3\u00a0<\/strong>\u2018Improvement recommended\u2019 This code more often than not implies that while the installation may not comply with the current set of regulations, complies with a previous set of regulations and so is deemed to be safe although this safety can be improved upon.<\/li>\n<\/ul>\n<h3>Test reports:<\/h3>\n<p><a href=\"\/pdf\/eicr2021.pdf\">EICR 2021<\/a><\/p>\n<\/div>\n<\/div><\/div><\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>EICR (Electrical Installation Condition Report) This is a report of the condition of the electrical installation and will highlight any safety shortcomings, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":17,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-templates\/page_front-page.php","meta":{"footnotes":""},"class_list":["post-19","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/ambercourt3.bml.site\/index.php\/wp-json\/wp\/v2\/pages\/19","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ambercourt3.bml.site\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/ambercourt3.bml.site\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/ambercourt3.bml.site\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ambercourt3.bml.site\/index.php\/wp-json\/wp\/v2\/comments?post=19"}],"version-history":[{"count":4,"href":"https:\/\/ambercourt3.bml.site\/index.php\/wp-json\/wp\/v2\/pages\/19\/revisions"}],"predecessor-version":[{"id":264,"href":"https:\/\/ambercourt3.bml.site\/index.php\/wp-json\/wp\/v2\/pages\/19\/revisions\/264"}],"up":[{"embeddable":true,"href":"https:\/\/ambercourt3.bml.site\/index.php\/wp-json\/wp\/v2\/pages\/17"}],"wp:attachment":[{"href":"https:\/\/ambercourt3.bml.site\/index.php\/wp-json\/wp\/v2\/media?parent=19"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}